中文/English 搜索 Home About TGSHK News Product Projects Case Trading Case Message Contact Company News 首页 > News > Company News March 17, 2020 Shanghai Chairman Yin Hongbing, Xu Xiuyang and Ren Xiwei from the Engineering Department discussed the Dubai project with foreign clients Ali and Julia 发布日期: 浏览次数:615 上一条:March 26, 2020 Ma'anshan Company Chairman Yin Hongbing and CEO Zhang Ting, Trade Department Wang Haiying, Energy Department Director Wu Yuwen, Engineering Department Xu Xiuyang, Ren Xiwei and China Ra 下一条:On March 15, 2020, Yin Hongbing, Chairman of Tianjin Company, together with Wu Yuwen, director of the Ministry of Energy, Xu Xiuyang and Ren Xiwei of the Engineering Department, discussed the Dubai pr 相关文章 ·May 5, 2023 Beijing Presiden ·June 29, 2015, Maanshan. TGS ·May 4, 2023 beijing Presiden ·June 23, 2015, Beijing. The ·April 11, 2023 Saudi Arabia ·June 19, 2015, Maanshan. The ·March 29 2023, Dhaka Yin Ho ·June 16, 2015, Maanshan. The ·March 29, 2023, Oman Mr Yinh ·June 6, 2015, Israel, 9:00 A Adodb 事务提交失败Adodb 关闭数据库连接失败
Company News 首页 > News > Company News March 17, 2020 Shanghai Chairman Yin Hongbing, Xu Xiuyang and Ren Xiwei from the Engineering Department discussed the Dubai project with foreign clients Ali and Julia 发布日期: 浏览次数:615 上一条:March 26, 2020 Ma'anshan Company Chairman Yin Hongbing and CEO Zhang Ting, Trade Department Wang Haiying, Energy Department Director Wu Yuwen, Engineering Department Xu Xiuyang, Ren Xiwei and China Ra 下一条:On March 15, 2020, Yin Hongbing, Chairman of Tianjin Company, together with Wu Yuwen, director of the Ministry of Energy, Xu Xiuyang and Ren Xiwei of the Engineering Department, discussed the Dubai pr 相关文章 ·May 5, 2023 Beijing Presiden ·June 29, 2015, Maanshan. TGS ·May 4, 2023 beijing Presiden ·June 23, 2015, Beijing. The ·April 11, 2023 Saudi Arabia ·June 19, 2015, Maanshan. The ·March 29 2023, Dhaka Yin Ho ·June 16, 2015, Maanshan. The ·March 29, 2023, Oman Mr Yinh ·June 6, 2015, Israel, 9:00 A
March 17, 2020 Shanghai Chairman Yin Hongbing, Xu Xiuyang and Ren Xiwei from the Engineering Department discussed the Dubai project with foreign clients Ali and Julia 发布日期: 浏览次数:615