中文/English 搜索 Home About TGSHK News Product Projects Case Trading Case Message Contact Company News 首页 > News > Company News August 11, 2022 Dhaka The on-site inspection of TGS on the energy project in cooperation with the Bangladeshi military ended successfully. 发布日期: 浏览次数:338 上一条:August 23, 2022 Dhaka Yesterday,TGS President Mr.Yin Hongbing, inspected the China Power Construction Hydropower Port and Shipping Bureau. 下一条:July 28, 2022 Dhaka Arranged by TGS President George,Bangladesh Army Second Chief led his team to discuss frame contract with Power China on project . Both is satisfied with the meeting. 相关文章 ·July 17, 2015, Beijing. The ·June 17, 2023 Iraq Saleh and ·July 16, 2015, Beijing. The ·May 20, 2023 Beijing At the ·July 7, 2015, Hefei. The pre ·May 4, 2023 beijing Presiden ·July 6, 2015, Maanshan.The g ·April 23, 2023 Dubai Chairma ·June 29, 2015, Maanshan. TGS ·March 30 2023,Dhaka TGS arra
Company News 首页 > News > Company News August 11, 2022 Dhaka The on-site inspection of TGS on the energy project in cooperation with the Bangladeshi military ended successfully. 发布日期: 浏览次数:338 上一条:August 23, 2022 Dhaka Yesterday,TGS President Mr.Yin Hongbing, inspected the China Power Construction Hydropower Port and Shipping Bureau. 下一条:July 28, 2022 Dhaka Arranged by TGS President George,Bangladesh Army Second Chief led his team to discuss frame contract with Power China on project . Both is satisfied with the meeting. 相关文章 ·July 17, 2015, Beijing. The ·June 17, 2023 Iraq Saleh and ·July 16, 2015, Beijing. The ·May 20, 2023 Beijing At the ·July 7, 2015, Hefei. The pre ·May 4, 2023 beijing Presiden ·July 6, 2015, Maanshan.The g ·April 23, 2023 Dubai Chairma ·June 29, 2015, Maanshan. TGS ·March 30 2023,Dhaka TGS arra
August 11, 2022 Dhaka The on-site inspection of TGS on the energy project in cooperation with the Bangladeshi military ended successfully. 发布日期: 浏览次数:338